Portfolio

Ashington, Northumberland

ASHINGTON. NORTHUMBERLAND

MAIN. BATHROOM.

My family bathroom is now completed just in time for Christmas and done in time before our newborn is due.

My home has been non-stop since we moved in and this was a massive piece of the puzzle that needed to be done before our baby arrives. At first, I was going to play it safe with the colours but the wife wanted to try something out of our comfort zone and be totally different, and I was totally blown away with her choices: blue tiles, blue grout finished with fluted brushed gold fittings.

I would also like to take this opportunity to thank all our customers from 2024 and in the future into 2025. Rob and I have thoroughly enjoyed every project we’ve worked on this year. My installation dates are quoted 9 months in advance, and I am very proud to say not one installation date has been missed, I run a very tight schedule and to not miss one installation date is absolutely incredible for consistency.

Believe it or not, the only install date that had to be postponed was my own bathroom as the tiles were delayed along with other minor issues.

I want to say a huge thank you to the team at Westerhope Tile Centre for everything they’ve done this year, without you my operation wouldn’t be running the way it is now.

A huge thank you to my subcontractors Darren Atkinson, SGM Plastering & Preservation , MWT Waste Disposal & Wot Knot Joinery for keeping up with my schedule and not letting me down. Running schedules as tight as I do requires a tradesman who can be extremely reliable, and provide excellent workmanship along with high standards.

The team at DS Bathrooms want to wish you all a Merry Christmas and all the best for 2025 to all my customers & followers.